|  The load of Southern Yellow Pine T&G flooring (188 pieces)
 |  A stack of flooring ready to treating
 |  Spraying Penofin
 | 
|  A batch after spraying
 |  A batch drying
 |  Spraying the edges while stacked
 | 
|  Checking the work
 |  About half done, all that would fit
 |  Chuck, Steve, Dad, and Mark laying floor
 | 
|  Steve nailing, Chuck holding, Mark cutting
 |  First section nearly done
 |  Mike, Chuck, Lisa and Mark
 | 
|  Mike and Chuck cutting
 |  Mark nailing, note puller tool
 |  Dipping cut end
 | 
|  Dipping cut end
 |  A second side done
 |  Mike and Mark working on East side
 | 
|  New paint scheme
 |  Picking up
 |  Five sides done (mostly)
 | 
|  East
 |  North-east
 |  North
 | 
|  North-west
 |  West
 |  Mike and Mark decking
 | 
|  Pile of Trex decking
 |  Mark screwing down Trex
 |  We put down outer course of decking first to make sure it all lined up
 | 
|  Special screws.  Small head, reverse thread under head (6 cents each!)
 |  Mike and Mark picking up a piece of Trex - limp noodle
 |  Cutting miter
 | 
|  Screwing down
 |  Hole left by screw (note shavings)
 |  Holes after pushing shaving back in and tapping with hammer (nearly invisible)
 |