|  The first load of panels comes off the forklift.
 |  Mark taking over the fork lift.
 |  The first load that Mark took from the semi.
 | 
|  Mike and Ben lifting panels on to the fork.
 |  Setting down the panels on to the pallets.
 |  The last load of panels.
 | 
|  Setting down the last load of panels.
 |  All of the panels and Styrofoam.
 |  The Munn Lumber truck with the wood for the basement, and the first floor floor.
 | 
|  Mike and Mark lining up the sill plates so they will go on smooth.
 |  Mike and Mark final putting on the sill plates with the Styrofoam and pl400 glue.
 |  Counter sinking the holes in the sill plates to the j-bolts will fit.
 | 
|  Finally putting together the first walls.
 |  Ben sitting doing nothing.
 |  Mike and Grandpa cutting studs.
 | 
|  Mark, Tigon, Mike, Grandpa, and Ben in the hole measuring.
 |  Mike and Grandpa cutting.
 |  Mike, Mark, and Ben putting together a wall.
 | 
|  Four men in the hole with one girl.
 |  Tigon cutting the board for the door.
 |  Four men in the hole.
 |