The first load of panels comes off the forklift.
|

Mark taking over the fork lift.
|

The first load that Mark took from the semi.
|

Mike and Ben lifting panels on to the fork.
|

Setting down the panels on to the pallets.
|

The last load of panels.
|

Setting down the last load of panels.
|

All of the panels and Styrofoam.
|

The Munn Lumber truck with the wood for the basement, and the first floor floor.
|

Mike and Mark lining up the sill plates so they will go on smooth.
|

Mike and Mark final putting on the sill plates with the Styrofoam and pl400 glue.
|

Counter sinking the holes in the sill plates to the j-bolts will fit.
|

Finally putting together the first walls.
|

Ben sitting doing nothing.
|

Mike and Grandpa cutting studs.
|

Mark, Tigon, Mike, Grandpa, and Ben in the hole measuring.
|

Mike and Grandpa cutting.
|

Mike, Mark, and Ben putting together a wall.
|

Four men in the hole with one girl.
|

Tigon cutting the board for the door.
|

Four men in the hole.
|